WHY DO YOU NEED A PROJECT MANAGER?

With property development and construction there are many moving parts that are involved in any construction project. There are many different contractors and subcontractors involved in a construction site, each with their own area of expertise and responsibilities. From the initial planning stages to the final delivery of a finished product, there are countless tasks that need to be coordinated and managed to ensure that everything runs smoothly. This is where M3 Africa steps in to ensure everyone and everything is integrated effectively and efficiently.

Coordinating different teams

Each contractor plays a vital role in ensuring that the project is completed successfully, and it is important for them to work together effectively to achieve the desired results. On any given construction development, M3 Africa has had to coordinate and manage the various teams.

These include but are not limited to:

  • General contractor is responsible for overseeing the entire construction project, including hiring subcontractors and coordinating their work. They are the primary point of contact for the client and are responsible for ensuring that the project is completed on time and within budget.
  • The architect is responsible for designing the development and creating detailed plans and specifications. They work closely with the client to ensure that their vision is realised and with the general contractor to ensure that the plans are executed correctly.
  • The structural engineer is responsible for designing the structural elements of the building, such as the foundation, walls, and roof. They ensure that the building is structurally sound and can withstand the loads it will be subjected to.
  • Mechanical, Electrical, and Plumbing (MEP) Contractor is responsible for designing and installing the building’s mechanical, electrical, and plumbing systems. This includes everything from heating and cooling systems to electrical wiring and plumbing fixtures.
  • The civil contractor is responsible for site preparation and grading, installing utilities such as water and sewer lines, and paving roads and parking lots.
  • The landscape contractor is responsible for designing and installing the landscaping around the building, including planting trees and shrubs, installing hardscaping such as patios and retaining walls, and laying sod or other ground cover.

Central communication chain

M3 Africa pride their services on effective communication. One of the primary roles of a project manager is to ensure that all parties involved in the construction project are working together effectively. This requires excellent communication skills and the ability to coordinate the efforts of various contractors and subcontractors.

By acting as a central point of contact, M3 Africa has been able to help ensure that everyone is on the same page and that the project is progressing smoothly. By communicating progress and providing regular updates, we’ve ensured stakeholders understood the project’s status and managed their expectations.

Risk Management

Construction developments are inherently risky, with many potential hazards and obstacles that can arise. M3 Africa can help to identify and manage these risks by creating a detailed risk management plan. This plan can include contingencies for potential problems and a clear strategy for how to respond if they do arise. By being proactive and addressing potential issues before they become serious problems, M3 Africa has managed to minimise delays and cost overruns.

Budget Management

Another important role of a project manager is to manage the budget for the construction project. This requires a deep understanding of the costs involved in the project and the ability to make informed decisions about where to allocate resources. By carefully managing the budget, M3 Africa has helped ensure that construction and all the different roles involved stay on track financially. It is our job to ensure there are no unexpected expenses that could cause delays or derail the project entirely.

Time Management

Time is of the essence. When people invest in off-plan developments, it’s even more so important for timelines to stay on track. M3 Africa have been responsible for ensuring that construction projects of all scales is completed on time. This requires excellent time management skills and the ability to coordinate the efforts of various contractors and subcontractors. By setting clear deadlines and milestones and monitoring progress closely, a we have helped ensure that projects stay on track and that any potential delays are addressed promptly.

It is evident how important the role a project manager plays in any construction site. A project manager is responsible for overseeing all aspects of the construction process, from the planning stages to the final delivery of the finished product. If you are looking to ensure the success of your next construction project, be sure to work with M3 Africa.

Recent blogs

ENQUIRE

"*" indicates required fields

Your PRIVACY is our priority. By submitting this form, you agree to our PRIVACY POLICY.

This field is for validation purposes and should be left unchanged.

HEALTHCARE

Sports and leisure

LA LUCIA MALL - gallery

Durban Christian Centre - gallery

OUR PORTFOLIO

Industrial

- Transnet Richards Bay

- VOPAK Terminal Growth 4

- Transnet - Upgrade of the Road into the Substation - Hilltop

- Transnet - Upgrade of the Fire Equipment on Substation – Kroonstad

Commercial

- Growthpoint Properties, La Lucia Mall Upgrade - Phase 1, Retail

The 37, 286m2 La Lucia Mall has been a Durban Landmark for over forty years and has undergone several expansion projects during this time. The latest upgrade, however was the first of its kind in over 15 years. With the mall trading throughout the construction, meticulous planning made the work as seamless and nonintrusive for shoppers, retailers and local stakeholders as possible.

The scope of the project incorporated the following:

  • Transnet Richards Bay
  • VOPAK Terminal Growth 4
  • Transnet – Upgrade of the Road into the Substation – Hilltop
  • Transnet – Upgrade of the Fire Equipment on Substation – Kroonstad

- MSC Passenger Terminal, Durban

Constructure of the new Durban Cruise Terminal in the Port of Durban. The project scope included:
  • 4500m²² new build cruise terminal
  • Widening of Mahatma Gandhi Road

- Beacon Hill, Office Refurbishment, Bisho, Eastern Cape

- Durban Christian Centre - Jesus Dome Mayvile

The DCC Jesus Dome has been a Durban Landmark sitting aside the N3 highway at the entrance to the CBD since 1979. It is a home and place of worship for thousands of people from the local community. Devastatingly the building was struck by a catastrophic fire in June 2016 and was destroyed.

In early 2017, with the support of our loyal congregation the church embarked on the construction of the new Jesus Dome on the site of the old building.

The new building comprises the following:

  • 170m2 Chapel and Baptismal Pool
  • 300m2 School classrooms
  • 1,000m2 Fellowship area and communal function facilities
  • 2,700m2 seater Church auditorium
  • Television and film production facilities
  • Offices, stores, and other ancillary zones

Retail

- Pick 'n Pay, Athlone Circle Fit-out

- Fit24 Gym, Athlone Circle, Fit-out

- Fit24 Gym, Park Square, Fit-out

- Pencil Club, Executive Members Club, Fit Out Project

- Legacy Yard, Umhlanga Arch

Mixed-Use

- Umhlanga Arch Mixed-Use

Umhlanga Arch is a R1.3 billion, 45,000m2 FAR development in Umhlanga which combines the following components:

  • Luxury Motor Dealership of 5,000m2
  • Commercial Offices of 6,800m2
  • High End Retail Shops, Unique Food Hall, and Restaurants of 5,000m2
  • 207 key Global Brand Hotel of 10,000m2
  • 200 Luxury Residential Apartments of 16,000m2
  • Club and Conference Facilities of 1,500m2
  • Parking structures, parkland and public space, and other ancillary areas

- Zimbali Wedge Mixed-Use, Development Phase 3

- Athlone Circle Mixed-Use Development

- Salta Sibaya

Construction of the bulk infrastructure for the development of a new residential estate at Umdloti, KZN. The scope of works includes:

  • 300,000m³ of bulk earthworks
  • 16km of new roads
  • 30km of new stormwater network
  • 20km of new sewer network

- Healthcare

  • Accommodation Wing Refurbishment

  • Clairwood Hospital – Refurbishment

  • Wentworth Hospital – Refurbishment

  • Mosvold Hospital – Refurbishment

  • Bethesda Hospital – Refurbishment

  • St Francis Hospital – Refurbishment

  • Siloah Hospital – Refurbishment

  • GJ Crookes Hospital Refurbishment COVID 19

  • King Dinuzulu Hospital – COVID 19 Quarantine Facility

- Leisure

  • Development Club Med Resort, Tinley Manor, North Coast Durban

  • Hilton Hotel – Hilton Garden Inn, Umhlanga

- Residential

  • Hauseberger Residence, Zimbali

  • Sleepy Hollow – Building Refurbishment

RESIDENTIAL

HEALTHCARE

Commercial

INDUSTRIAL

Elite Moda Warehouse - gallery

MIXED USE

RETAIL

HESKETH ESTATE - gallery

Salta Sibaya - GALLERY

MSC Cruises Passenger Terminal - GALlERY

Marine Walk Shopping Centre - gallery

Brickworks Industrial Estate - gallery

Umhlanga Arch - gallery

× Chat with us