MITIGATING CHALLENGES THROUGH PROJECT MANAGEMENT

If a development or any onsite project does not have a project manager, it can lead to a number of potential problems. These challenges could ultimately result in the project failing to meet its objectives. That is why M3 Africa’s role onsite can avoid any potential problems and streamline the whole process from start to finish.

Lack of coordination

Without a project manager, there may be no one responsible for coordinating the efforts of various contractors and subcontractors. M3 Africa’s role in project management can help avoid unstructured processes and eliminate:

  • Missed deadlines: M3 Africa can help coordinate efforts and keep everyone on the same page, avoiding contractors and subcontractors to miss deadlines. A missed deadline can result in lead to delays, cost overruns, missed opportunities and investors pulling out.
  • Duplication of efforts: When there is no one responsible for coordinating efforts, contractors and subcontractors may end up duplicating their efforts, leading to inefficiencies, and wasted resources. M3 Africa keeps track of all the work done.
  • Confusion about responsibilities: In the absence of a project manager, contractors and subcontractors may not be clear about their roles and responsibilities, leading to confusion and misunderstandings. M3 Africa ensures everyone involved clearly understands what their role is to play in the success of the overall project deliverables.
  • Lack of communication: M3 Africa is the middle man between those on the ground and off site. Their communication has helped facilitate communication between stakeholders. The absence of communication will undoubtedly result in to misunderstandings and mistakes.
  • Quality control issues: Without a project manager to oversee quality control, there may be a lack of consistency and uniformity in the construction project. This can lead to safety concerns, rework, and additional expenses.

M3 Africa ensures that everyone is working towards the same goals, deadlines are being met, and communication is flowing smoothly.

Cost overruns

A lack of budget management can lead to cost overruns and unexpected expenses. This can happen due to a range of reasons, including unexpected expenses, changes in scope, delays, and poor budget management. Without a project manager to monitor the budget and make informed decisions about resource allocation, it can be difficult to keep costs under control.

With M3 Africa’s assistance, we can help mitigate cost overruns through:

  • Accurate budgeting and considering all the possible expenses, such as labour costs, material costs, and equipment costs. This can help prevent underestimating the costs and ensure that the project has sufficient funds to complete all the tasks.
  • Ensuring there is effective resource allocation which includes labour, materials, and equipment, to prevent overspending on one area while neglecting another.
  • Regularly monitoring a project’s progress and expenses helps identify any deviations from the budget. This can help prevent small issues from becoming significant problems that could lead to cost overruns.
  • Managing changes to the project scope, schedule, or budget. Any changes to the project should be analysed and evaluated before being implemented to ensure that they won’t impact the project’s overall cost.
  • Identify potential risks that could impact the project’s cost and develop contingency plans to address them.

In the absence of project management, cost overruns can occur due to poor budget management, inadequate resource allocation, lack of monitoring, scope creep, and poor risk management. These factors can lead to unexpected expenses, delays, and additional costs that were not included in the project’s original budget.

Delays

A lack of time management can result in delays in any construction project. Without M3 Africa playing their part as project managers, you will not have clear deadlines set or be able to monitor progress. It can be difficult to ensure that the project stays on track.

Delays can occur in a construction project for various reasons, including poor planning, changes to the project scope, poor communication, unforeseen circumstances, and weather-related issues.

M3 Africa creates an efficient and detailed project plan that includes all tasks and timelines required to complete the project. A schedule of tasks is provided ensuring that each one is completed before the next one begins. As the project manager, we can allocate resources effectively, ensuring that the project has sufficient resources to complete the tasks on time.

All of the above is executed through effective communication and having identified the risks involved.

Our effective project management can help mitigate delays by creating a detailed project plan, scheduling tasks effectively, facilitating communication between all parties involved in the project, managing risks, and allocating resources effectively.

Quality control issues

A project manager is responsible for ensuring that the construction project meets the required quality standards. M3 Africa monitors the quality of work being done and addresses any issues that arise.

In the absence of project management, quality control issues can arise due to a lack of clear quality standards, inadequate inspections and testing, and a lack of training for contractors and subcontractors. These issues can lead to rework, additional costs, and delays, which can impact the project’s overall timeline and budget.

Safety concerns

Construction sites can be dangerous places! Without a project manager to oversee safety protocols and ensure that everyone is following proper safety procedures. These issues can lead to accidents and injuries, which can impact the project’s timeline and budget, and can even lead to legal and financial consequences. Safety concerns are a top priority in any M3 Africa project oversight.

  • M3 Africa establish safety protocols and guidelines for the construction site.
  • Regular safety inspections are followed, and that any hazards are identified and addressed promptly.
  • We provide regular safety training and education for workers to ensure that they are aware of potential hazards and know how to operate safely on the construction site.

Safety concerns can arise due to a lack of clear safety protocols, inadequate safety inspections, insufficient safety training, and a lack of communication and coordination.

Not having a project manager onsite can lead to a range of potential problems and challenges that could ultimately result in the project failing to meet its objectives. To ensure the success of your construction project, it is essential to hire an experienced and skilled project manager, like M3 Africa. We have immense experience in coordinating efforts, managing budgets, ensuring quality control, and prioritising safety.

Recent blogs

ENQUIRE

"*" indicates required fields

Your PRIVACY is our priority. By submitting this form, you agree to our PRIVACY POLICY.

This field is for validation purposes and should be left unchanged.

HEALTHCARE

Sports and leisure

LA LUCIA MALL - gallery

Durban Christian Centre - gallery

OUR PORTFOLIO

Industrial

- Transnet Richards Bay

- VOPAK Terminal Growth 4

- Transnet - Upgrade of the Road into the Substation - Hilltop

- Transnet - Upgrade of the Fire Equipment on Substation – Kroonstad

Commercial

- Growthpoint Properties, La Lucia Mall Upgrade - Phase 1, Retail

The 37, 286m2 La Lucia Mall has been a Durban Landmark for over forty years and has undergone several expansion projects during this time. The latest upgrade, however was the first of its kind in over 15 years. With the mall trading throughout the construction, meticulous planning made the work as seamless and nonintrusive for shoppers, retailers and local stakeholders as possible.

The scope of the project incorporated the following:

  • Transnet Richards Bay
  • VOPAK Terminal Growth 4
  • Transnet – Upgrade of the Road into the Substation – Hilltop
  • Transnet – Upgrade of the Fire Equipment on Substation – Kroonstad

- MSC Passenger Terminal, Durban

Constructure of the new Durban Cruise Terminal in the Port of Durban. The project scope included:
  • 4500m²² new build cruise terminal
  • Widening of Mahatma Gandhi Road

- Beacon Hill, Office Refurbishment, Bisho, Eastern Cape

- Durban Christian Centre - Jesus Dome Mayvile

The DCC Jesus Dome has been a Durban Landmark sitting aside the N3 highway at the entrance to the CBD since 1979. It is a home and place of worship for thousands of people from the local community. Devastatingly the building was struck by a catastrophic fire in June 2016 and was destroyed.

In early 2017, with the support of our loyal congregation the church embarked on the construction of the new Jesus Dome on the site of the old building.

The new building comprises the following:

  • 170m2 Chapel and Baptismal Pool
  • 300m2 School classrooms
  • 1,000m2 Fellowship area and communal function facilities
  • 2,700m2 seater Church auditorium
  • Television and film production facilities
  • Offices, stores, and other ancillary zones

Retail

- Pick 'n Pay, Athlone Circle Fit-out

- Fit24 Gym, Athlone Circle, Fit-out

- Fit24 Gym, Park Square, Fit-out

- Pencil Club, Executive Members Club, Fit Out Project

- Legacy Yard, Umhlanga Arch

Mixed-Use

- Umhlanga Arch Mixed-Use

Umhlanga Arch is a R1.3 billion, 45,000m2 FAR development in Umhlanga which combines the following components:

  • Luxury Motor Dealership of 5,000m2
  • Commercial Offices of 6,800m2
  • High End Retail Shops, Unique Food Hall, and Restaurants of 5,000m2
  • 207 key Global Brand Hotel of 10,000m2
  • 200 Luxury Residential Apartments of 16,000m2
  • Club and Conference Facilities of 1,500m2
  • Parking structures, parkland and public space, and other ancillary areas

- Zimbali Wedge Mixed-Use, Development Phase 3

- Athlone Circle Mixed-Use Development

- Salta Sibaya

Construction of the bulk infrastructure for the development of a new residential estate at Umdloti, KZN. The scope of works includes:

  • 300,000m³ of bulk earthworks
  • 16km of new roads
  • 30km of new stormwater network
  • 20km of new sewer network

- Healthcare

  • Accommodation Wing Refurbishment

  • Clairwood Hospital – Refurbishment

  • Wentworth Hospital – Refurbishment

  • Mosvold Hospital – Refurbishment

  • Bethesda Hospital – Refurbishment

  • St Francis Hospital – Refurbishment

  • Siloah Hospital – Refurbishment

  • GJ Crookes Hospital Refurbishment COVID 19

  • King Dinuzulu Hospital – COVID 19 Quarantine Facility

- Leisure

  • Development Club Med Resort, Tinley Manor, North Coast Durban

  • Hilton Hotel – Hilton Garden Inn, Umhlanga

- Residential

  • Hauseberger Residence, Zimbali

  • Sleepy Hollow – Building Refurbishment

RESIDENTIAL

HEALTHCARE

Commercial

INDUSTRIAL

Elite Moda Warehouse - gallery

MIXED USE

RETAIL

HESKETH ESTATE - gallery

Salta Sibaya - GALLERY

MSC Cruises Passenger Terminal - GALlERY

Marine Walk Shopping Centre - gallery

Brickworks Industrial Estate - gallery

Umhlanga Arch - gallery

× Chat with us